In the year 2021 we continued on working on our new house. The Covid-19 pandemic was ongoing for the full year.

  1. January: North wall. Planting bushes and trees.
  2. February: West wall. Ceiling bathroom first floor. Internet through fiber.
  3. March: Dug the mini dyke. Planted trees and bushes.
  4. April: South wall, support beams.
  5. May: Early May, done with red planks. Started with Gypsum plates in Kitchen.
  6. June: Gypsum plates. Our sheep arrived! Doorposts.
  7. July: Gypsum plates.
  8. August: Gypsum plates.
  9. September: Gypsum plates. End of September, Floorboards. Preparation floor heating.
  10. October: Gypsum plates.
  11. November: Floor heating. Anhydrite floor. Tiling.
  12. December: Tiles finished. The heating system started.
PostPublished On
Defective floortiles
We reached two significant milestones this week
The first floor equalized
The heating system project stalled
Installation of the heating system has started
Finished the foundation of the heat pump
We received the rest of the tiles
Export YouTube Music Playlist to Excel using Word
This week wet room floors were cast in cement
The anhydrite floor
Ready for the floors
Started the last gypsum project
Finished ventilation in the washing room
Finished the window sills
Removed the temporary stairs
Finished the first floor
Finished the ceiling of the ground floor
Gypsum from living room to hall
Gypsum in the ceiling on the ground floor
Finished the first floor
Finished the ceiling of the hobby room
The gypsum plate swap
Worked on the ceiling
Started working on the ceiling
Another gypsum week
One stack of gypsum removed from the living room
The gypsum plates swap
Started on a new pile of gypsum plates
Our doorposts were mounted
Finished the ceiling of our bedroom
The north wall of the staircase
Our sheep arrived
Three sisters
Sounds in the blogsystem
This week it rained a lot
We finished the planks
Eleven planks to go
Good progress putting up red planks
Finished mounting the horizontal support beams
Mounted all fascia boards except the two last
Painting fascia boards
Fascia boards for the south wall
Started working on the south wall
The small details to finish the north and west wall
Created our mini dyke
Finished the west wall
Tangible progress on the west wall
The fiber modem was mounted
Started working on the west wall
Finished the vertical planks on the north wall
Finished half of the north wall
Snow for the first time at the new house
Replaced downpipes for the fourth time